• 70170017, 99991776
  • info@tsatsrakhtsog.mn
  • Works and developments have been carried out in 2006
    • As for the  year  of  2006,  reconstruction  of  DKHKHA  of  Thermal  Power  Plant,

    st nd

    maintenance service of the 1  and 2  furnace exhauster and remote control of main

    dampers in Dalanzadgad.

    • Worked out design drawing of 0.4 kW electricity transmission lines and substations

    in Altai soum, Khovd province.

    • Design project and constructions works of exterior power supply in Khamar temple,

    Dornogobi province.

    Works and developments have been performed in 2007

    • Worked out and commissioned the design project of 35kW electricity transmission

    lines  from  Baruunbayan-Ulaansoum  of  Uvurkhangai  province  to  Bayanligsoum  of

    Bayankhongor province within a program “National power energy system of Mongolia”

    in 2007.

    • Drawing of 10kW electricity transmission lines in Teshigsoum, Bulgan province.
    • Handed over the drawing of 107km electricity transmission line and substation in

    Zuunbayan and Khuvsgulsoums in Dornogobi province.

    • Therefore, successfully delivered steel pipes to power plant in Dornod province in

    having selected in a tender of steel pipe delivery, announced by World Bank project

    group.

    *45km 10kW Electricity Transmission lines in Bayanligsoum, Bayankhongor province

    Works have been carried out in 2008

    • Construction of 10kW electricity transmission lines and substation in Chandmani and

    Erdenesoum, Gobi-Altai province 2008 and handed over it to the State Commission.

    • Construction of  15kW  electricity  transmission  lines  and  substation  in  Asgаt  and

    Bayankhairkhan sum in Zavkhan province; and successfully commissioned it.

    30 km length electricity transmission lines in Khamar monastery.

    Works have been completed in 2009

    • Construction works of 0.4 kW electricity transmission lines in Mandakh and Khatanbulag

    of  Umnugobi  province  and  Matadsoumn  of  Dornod  province  have  been  successfully

    completed and commissioned to the State Commission.

    • Worked out  the  design  drawing  of  0.4kW  electricity  transmission  lines  and

    substation in Gurvantes of Umnugobi province.

    Works have been completed in 2010

    • Assembly and construction of 86.1 km 35 kW length electricity transmission lines in

    Nariinsukhait and Noyonsoums of Umnugobi province in 2011, 35/15kW substation with a

    capacity of 630 kW, 35/6 kW annex in Nariinsukhait, 160 kV substation (15/0.4kW), 4.7km

    th

    electricity transmission lines (0.4kW) have been completed on the 15  July 2010 and

    rd

    commissioned them to the State Commission on the 23  Apr 2011.

  • Works have been carried out in 2011 and 2012
    • Construction of electricity transmission lines, 6/04 kW substation and relevant facilities

    for Treatment and Diagnostic Center in Erdenet city have been carried out in 2011, and

    th

    commissioned them to Erdene city on the 06  Dec 2011. Constructions works of Four

    set 10/04 kW electricity transmission lines and substation in Ger district of Bayanzurkh

    and Chingeltei district in Ulaanbaatar city have been completed in 2012.

    • Construction works  of  10kW  electricity  transmission  lines  and  400kV  station  in

    Khiimoriovoo – Chandmani am, Khan-Uul district, Ulaanbaatar city in 2012 have been

    performed and commissioned.

    • Construction works  of  10/04kW  electricity  transmission  lines  and  substations  in

    Dalanzadgad and Nisekhger districts of Umnugobi province, ger district in Zuunsuu of

    Tsogt-Tsetsii and Uguumur have been started in September 2012 and then completed

    and commissioned them to the State Commission in November 2012.